Quality Control

Defined checkpoints before shipment release

Inspection scope, applicable standards, acceptance criteria and document availability must be confirmed for each project. This page does not assert unverified certifications.

Inspection Flow

Quality steps across fabrication

  1. 1

    Material receiving check

    Review material identification and available documentation against approved requirements.

  2. 2

    Cutting and drilling check

    Review dimensions, hole locations and component identification.

  3. 3

    Assembly and welding check

    Review fit-up and welding against the confirmed fabrication and inspection scope.

  4. 4

    Dimensional inspection

    Check critical member dimensions and connection locations before release.

  5. 5

    Surface treatment check

    Review the confirmed surface preparation and coating requirements.

  6. 6

    Packing inspection

    Review marks, bundle protection, loose parts and packing information before loading.

Manual project review